Designed a layout in AutoCAD for removable safety railings for a train wash system using survey locations and elevations to send a drawing to the manufacturer to construct the correct number and size of railings.
Compiled $34 million worth of construction change orders for additional work added to a job outside the scope of the initial contract with the MBTA to ensure the contract gets completed per the contract owner's wishes.
Performed quality assurance checks on monthly update schedules and a 3-year schedule for the train maintenance facility project to make sure the project is on schedule and upholds the requirements of the contract with the MBTA
Contacted vendors and manufacturers to get samples and/or product information that needed to be submitted to the MBTA per the specifications of the contract to complete the job properly and on time.
Balanced ~$688,000 of police details to ensure that Barletta upholds their reputation and relationship with the MBTA and the police departments that were utilized.
Searched within contract specifications, equipment specifications and drawings, mechanical, plumbing, electrical, architectural, and structural drawings to ensure structures and equipment met the correct specifications and were installed properly as per the contract
Maintained the cleanliness and upkeep of the kitchen by disposing of garbage, washing dishes, restocking, and organizing to pass health inspections in order for the restaurant to stay in business
Prepared shellfish, asparagus, and green beans according to Barnstable food safety guidelines preventing cross-contamination so customers would come back to the restaurant